NO | PROJECT NAME | YEAR |
121 | FLYING SHEAR , CRANK SHAFT, GEAR, GEAR SHAFT, LADLE DISH END PALATE | 2012 |
122 | STRUCTURAL STEEL WORKS FOR ELPION PROJECT AT BANTING, SELANGOR | 2012 |
123 | GAS TURBINE SILENCER | 2012 |
124 | PROPOSED BILLET GRINDING & BILLET SHOT CHIMNEY EXTENSION | 2012 |
125 | INSTALLATION WORKS FOR DOWN GAUGE ALIGNMENT – SLAG PROCESSING PLANT | 2012 |
126 | STEEL BINS WORKS | 2011 |
127 | DUCTING, DUST COLLECTOR SYSTEM, PANEL. EBT PANEL | 2011 |
128 | RADIANT COOLER DUCT, ROOF PANEL, WATER COOLED PANEL | 2011 |
129 | NATURAL GAS & NITROGEN PIPING WORKS FOR SOAKING FURNACE | 2011 |
130 | COMBUSTION CHAMBER SUCTION ELBOW ASSEMBLY | 2011 |
131 | STEEL STRUCTURE FOR GATE HOUSE & FIRE TRUCK STATION | 2011 |
132 | HOPPER BODY FOR 758 CMS BAG FILTER | 2011 |
133 | STEEL STAIRCASE, HAND RAILING & CHANNEL SUPPORT | 2011 |
134 | WATER COOLED HOT GAS DUCT SUPPORT | 2011 |
135 | WATER COOLED HOT GAS LINE EAF #6, #7 & #8 | 2011 |
136 | EXPANSION TANK PLATFORM | 2011 |
137 | DESIGN & BUILD RMY SOIL TREATMENT (STONE COLUMN) | 2010 |
138 | ROLLING MILL – CIVIL & STRUCTURE | 2010 |
139 | LIME KILN – PHASE 2 | 2010 |
140 | 1×10 TPH LIME HYDRATION PLANT | 2010 |
141 | COMPLETE DUST COLLECTOR SYSTEM FOR SKULL CUTTING (80,000 M3/H) | 2010 |
142 | COMPLETE DUST COLLECTOR SYSTEM FOR WASTE GAS FIL TER SYSTEM (150,000 M3/H) & LIME DUST FIL TER SYSTEM (90,000 M3/H) | 2010 |
143 | 1000M3 LIME SILO AND STRUCTURES | 2010 |
144 | OVERHEAD CONVEYOR GANTRY STEEL STRUCTURE WORKS | 2010 |