Project References 3

PROJECT REFERENCES

NO PROJECT NAME YEAR
49 CJ-BIO-C3 PROJECT – C3-FERMENTATION EXTENSION (MM3-SUB-CS-016)
CJ-BIO-C3 PROJECT – C3-REFINERY #2 & #4 (MM3-SUB-CS-018)
CJ-BIO-C3 PROJECT – C3-DECK PIATE (MM3-SUB-CS022)
CJ-BIO-C3 PROJECT – C3-C3 SETS OF TANKS (MM3-SUB-ME-006)
CJ-BIO-C3 PROJECT – C3-EXTERIOR WORKS (MM3-SUB-CS-024)
CJ-BIO-C3 PROJECT – C3-YARD STEEL STRUCTURE 1 (MM3-SUB-CS-025)
CJ-BIO-C3 PROJECT – C3-YARD STEEL STRUCTURE 2 (MM3-SUB-CS-026)
2017
50 STEEL CONNECTION FOR CANOPY & BEAM STRENGTHENING WORKS 2016
51 FABRICATE & INSTALLATION OF – LINK BRIDGE STEEL STRUCTURE 2016
52 FABRICATE & ERECTIONTION OF 18 UNITS OF STAINLESS STEEL STORAGE TANK 2016
53 STRUCTURAL STEEL WORKS FOR UMV (PACKAGE 1,2 & 3-PRACELF) STRUCTURAL STEEL WORKS FOR UMV (PRACELCP3) 2016
54 COPPER BLOCK FOR VLB #1/3, #4/5, 80T LADLE ROOF , DELTERING 2016
55 DESARU CONFERENCE CENTRE – METAL ROOF COVERING WORKS DESARU CONFERENCE CENTRE – STEEL STRUCTURAL WORKS 2016
56 CJ-BIO-C2 PROJECT – C2-BUILDING DECK (MC2-SUB-CS-008)
CJ-BIO-C2 PROJECT – C2-EXTERIOR WORKS (MC2-SUB-CS-010)
CJ-BIO-C2 PROJECT – C2-PIPE RACK (MC2-SUB-CS-011)
CJ-BIO-C2 PROJECT – C2-NEW PRODUCT WAREHOUSE (MC2-SUB-CS-013)
CJ-BIO-C2 PROJECT – C2-SCRUBBER STACK (MC2-SUB-CS019)
CJ-BIO-C2 PROJECT – C2-STAINLESS STEEL TANK (MC2-SUB-ME-00)
2016
57 ROOM CEILING SUPPORT AT THE CURVE STATION & ONE U STATION MRT STATION – ONE UTAMA , DAMANSARA FABRICATE & INSTALLATION OF – LIFT FRAME AT TTDI & ONE UTAMA 2015
58 FABRICATE & INSTALL OF STEEL STRUCTURE WORKS (MALL) AT JOHOR BHARU 2105
59 FABRICATE & INSTALLATION OF CSO ROOM STRUCTURAL STEEL 2015
60 FABRICATE & INSTALLATION OF RAW MILL 1 NOZZLE 2015
61 NEW 1000 CUBIC METER WATER TANK 2015
62 FABRICATE OF SOCKET AND PULLY 2015
63 EQUIPMENT INSTALLATION 2015
64 STEEL STRUCTURE WORKS – PERUMAHAN 5 2015
65 FABRICATE SPACE TUBE C/W NUT TO BINTULU FABRICATE SPETCTACLE BLIND PLATE 2015
66 FABRICATE AF 6 FURNACE COOLED DELTA RING & PANEL 2015
67 FABRICATE OF NEW SKAG DOOR PANEL & ROOF PANEL 2015
68 CJ-BIO M-PROJECT – DA-3274 STRUCTURE
CJ-BIO-C2 PROJECT – C2 BUILDING STEEL STRUTURE (MC2-SUB-CS-002)
CJ-BIO-C2 PROJECT – CRYSTALIZER STEE (MC2-SUB-CS-005)
2015
69 KVMRT PACKAGE S3-FABRICATION & INSTALLATION OF LINK BRIDGE 2015
70 KVMRT PACKAGE S3-FABRICATION & INSTALLATION OF ROOF TRUSS 2015
71 STEEL SUPPORT FOR CYCLONE AT LEVEL 8 PREHEATER TOWER 2015
72 P38 HOIST BEAM MODIFICATION, DISMANTLE 34E3 TOP MOTOR TO INSTALL THE AGITATOR FOR MOLTEN SULPHUR TANK 2015