Project References 5

PROJECT REFERENCES

NO PROJECT NAME YEAR
97 WATER COOLED DUCT, FIX DUCT, MOBILE DUCT, LADLE HOOD, 2013
98 COPPER CONTACT PAD, SHELL PANEL, BSE CU-STEEL PANEL 2013
99 WATER COOLED PANEL NO. 8,9,10, ROOF ELBOW 2013
100 STAINLESS STEEL SILO 2013
101 STRUCTURAL STEEL WORKS – LINK BRIDGE 2013
102 STRUCTURAL STEEL WORKS – KERTIH, KEMANMAN 2013
103 MILD STEEL WORKS – STAIRCASE 2013
104 DC LOWER SHEEL, PANEL, WATER COOLED DUCT , LADLE HOOD SHAFT FURNACE PARTS, TILT FRAME 2013
105 NEW ROOF PANEL, WATER COOLED PANEL & DOOR TUNNER 2013
106 UPPER SHELL PANEL, ROOF PANEL, WATER COOLED DUCT 2013
107 TRANSFER TOWER TS11, CONVEYOR BC2A/2B, CHUTE BC2A/2B 2013
108 STEEL WATER TANK, 200M3, 3000M3 & 5000 M3 2013
109 LOWER SHELL STRUCTURE, VLB PANEL, SHAFT, SHAFT FURNACE PARTS TILT FRAM, WATER COOLED DUCT SMLS LADLE DISH & ETC. 2013
110 CONS TRUCTION SAMPLE PARTITION 2012
111 TUN DISH BODY, WATER COOL PANEL, EBT PANEL 2012
112 RADIANT COOLER DUCT, ROOF PANEL, WATER COOLED PANEL COPPER CONTACT PAD, WATER COOLED DOUBLE JACKET DUCT 2012
113 ROOF PANEL, PTI PANEL 2012
114 WATER COOLED DUCT , COOLING PANEL, ROOF PANEL 2012
115 RADIANT COOLER DUCT, ROOF PANEL, WATER COOLED PANEL COPPER CONTACT PAD, WATER COOLED DOUBLE DUCT 2012
116 MILD STEEL SILO AND STAINLESS STEEL SILO 2012
117 FABRICATE EXP ANSION JOINT 2012
118 STEEL BIN WORKS PACKAGES – PASIR GUDANG, JOHOR 2012
119 GANTRY CRANE STRUCTURE 2012
120 PIPING WORKS FOR BGV WIRE ROD MILL REVAMPING PROJECT 2012

 

1 | 2 | 3 | 4 | 5 | 6 | 7 | 8